Tuesday, May 02, 2006

A mixed bag

Day 3 of the 6 day shift cycle. Shift midday till 8:00 pm
Press - DTP
Tiles made: Rives GR13 BV 4000
Dry Tiles unstacked: Rives GR13 BV, Rives GR13 Terron, Demi Regence Terron.

The DTP press turned like a dream and 4000 is a good figure. When Everytheng went well I was bored mindless, sitting there with my roller and BV putting paint on the cut edges.
But then for certain periods the claes gave absolute shite, getting jammed in the descenseur, the ascenseur, the deveateur. I had to jump around and sort things out and still get back to make sure every tile had a little roll of paint.

0 Comments:

Post a Comment

<< Home