Day 6 of the 6 day shift cycle. Shift 8:00 pm till 4:00 am
Tiles made: Rives GR13 Gauche Rouge - 4700
Dry Tiles unstacked: Rives Corner RV, Rives GR13 Gauche Rouge
Another warm and humid night. The press turned like a dream. Unfortunately the bastard tipping conveyor belt was still not returning to position after tipping up. It did it about 30 times. Each time required a stop of the press, manual descend the conveyor and restart.
The sparkies finally sorted it by changing a relay.
So now 4 day's rest before the cycle starts again on Friday 4:00 am