Wednesday, January 11, 2006

Faiteaux - hard graft

Day 4 of the 6 day shift cycle. Shift 12:00 midday till 8:00pm
Tiles made: Faiteaux Rouge about 5500
Dry Tiles unstacked: Rives Chartreuse Terron (2 charges), Faitiers Demi-Rond 33 in Silvarcane Xahara (6 charges) Faiteaux Rouge - the rest.

It was hard work today - the Faiteaux are always hard work, and on the chain stacking side I had to stack from both conveyor belts.

This was because we are a bit short handed at the factory. Jonathan was over at the kiln so Cedric was driving the transbordeur. This left Guillaum's team short-handed. So the fat and useless Marseillais was drilling the holes in the douilles which left me stacking for both presses. Even though it's winter I worked up a sweat.

0 Comments:

Post a Comment

<< Home